August 6, 2020

Shea Concrete Products: The Precast Podcast, Episode #28

The Precast Podcast, Episode #28: Providing industry leading precast concrete buildings from initial concept through final installation – Easi-Set Buildings

Join Easi-Set Buildings Product Manager Jeremy Smith and Engineering Manager Chris Reese as they chat with the folks at Shea Concrete Products for a discussion on the customer benefits of Easi-Set Buildings and the relationship between the two companies.

Read more
July 21, 2020

Mountain West Precast goes the extra mile with Precision Pumping Systems

Mountain West Precast recently completed an Easi-Set Buildings pump house for new client Precision Pumping Systems. Click below for the rest of the story and a look at the video created by the customer.

Read more
June 3, 2020

Smith-Columbia completes large Fort Benning Easi-Set Buildings project

Easi-Set Buildings Producer Smith-Columbia completed the 37 Easi-Set Buildings contract from Atlanta based contractor Reams Enterprises. The GSA contract for U.S. Army base Fort Benning included: (7) 26’x22’ multi-user men’s and women’s plumbed latrines; (13) 80’x20’ classrooms; (13) single unit 12’x10’ ammo buildings; (3) double unit 24’x10’ ammo buildings; and (1) 14’x8’ grenade bunker.

Read more
May 28, 2020

Smith-Carolina delivers with new plant

Easi-Set Building Producer Smith-Carolina utilizes their new plant to roll out their latest Easi-Set Building.

Read more
May 18, 2020

Making quick work of a new water treatment installation

The State of Maryland Environmental Services made an easy choice for a remote water treatment facility.

Read more
March 31, 2020

Easi-Set Senior Engineer Chris Reese completes NPCA Leadership Academy

We are proud of Chris Reese, Easi-Set Worldwide’s Senior Engineer, on his recent graduation from the National Precast Concrete Association Leadership Academy . Chris was chosen to join a small group of select associates from NPCA member companies across North America for the year-long program.

Read more
March 11, 2020

Wastewater plant overhaul elicits budget concerns

One component proves itself an affordable solution

The Newport Borough Municipal Authority in Pennsylvania is in the process of replacing its existing wastewater treatment plant, a projected $10-million project to fix malfunction, contamination and overflow issues. The Newport Authority has a nearly $11.3 million loan from the USDA for the project, which it has to use first before it can access a nearly $3.8 million grant.

Read more
November 5, 2019

High School’s Fans Are Ready to Cheer with Added Comfort

Portable toilets are convenient, but they are not a long-term solution. Those cheering on the Panthers at Quakertown High School’s QNB Bank Field in Pennsylvania lived this, especially while standing in lines during games.

Read more
October 9, 2019

Philadelphia Phillies Urban Youth Academy Playing like the Pros with New Easi-Set Dugouts and Press Box

Participants of the Philadelphia Phillies Urban Youth Academy now have a feel for being a professional ball player because of renovations at the historic FDR Park. Since opening in 1914, the park has continually expanded to meet South Philadelphia residents’ needs. A recent project updated two existing softball fields with a shared press box and dugouts at one field. Precast concrete Easi-Set Buildings were selected for these three structures because of their affordability, durability and aesthetics. The buildings were manufactured by Oldcastle Infrastructure Inc., an Easi-Set Buildings licensed producer in Easton, Pa.

Read more
October 4, 2019

Snack shack lands at Milton-Freewater sports complex

The Union Bulletin – Walla Walla, WA - by Sheila Hagar MILTON-FREEWATER — The final pieces of the Milton-Freewater Unified School District’s bond project work were lowered into place at the Grove Sports Complex on Thursday.

Read more
Top